Cast Iron Replacement — Washington Street, Hollywood
Hydro-vac excavation beneath the foundation on Washington Street exposed severely damaged kitchen and laundry cast-iron branch drains, leading to a full cast iron replacement recommendation in Hollywood.
Before & After
The Problem
Hydro-vac excavation beneath the home's foundation on Washington Street in Hollywood exposed severely damaged kitchen and laundry branch drains. Completely rotted cast-iron sanitary piping with holes and missing sections was found in the 3-foot by 3-foot service tunnel area.
Diagnostic Process
Hydro-vac excavation was underway beneath the home's foundation, with the truck, tank, hoses, PVC suction piping, and safety cones set up on site. Crew members removed numerous coral boulders and coral rock from the 3-foot by 3-foot service tunnel using hydro-vac and manual chipping hammer work.
Once access was established, the exposed kitchen and laundry branch drains were inspected and found to be severely damaged — completely rotted cast-iron sanitary piping with holes or missing sections. Full cast iron replacement was recommended.
Step-by-Step Remediation
- 1
Assessment & Permit Applications
We begin with a detailed assessment of the existing cast iron plumbing system to identify damaged, deteriorated, or failing pipe sections. Our team reviews the project scope, access points, property conditions, and code requirements before submitting the necessary permit applications to ensure the replacement work is completed properly and in compliance with local regulations.
- 2
Tunneling, Pipe Removal & PVC Replacement
Once permits are approved, we carefully tunnel beneath the home to access the existing cast iron drain lines while minimizing disruption to the property. The old cast iron pipes are removed and replaced with durable PVC piping. After the new plumbing system is installed, we schedule and complete the required plumbing rough inspection to confirm the work meets code before moving forward.
- 3
Final Plumbing Inspection & Tunnel Backfill
After the rough inspection is approved, we proceed with the final plumbing inspection to verify that the replacement system is properly installed and ready for long-term use. Once final approval is received, the tunnel is carefully backfilled and compacted, restoring the underground access areas as safely and securely as possible.
- 4
Job Site Cleanup & Final Walkthrough
To complete the project, we clean all work areas, access points, and egress areas used during the job. Our team removes debris, organizes the site, and makes every effort to leave the customer's home and property cleaner than we found it. A final walkthrough ensures the work area is restored and the customer is satisfied with the completed project.
Issues Encountered & How We Solved It
On this Hollywood Washington Street job we encountered a substantial amount of coral boulders and coral rock in the 3-foot by 3-foot service tunnel beneath the foundation. They were removed by hydro-vac excavation and by hand with a chipping hammer in order to expose the cast-iron sanitary drain lines so the damaged piping could be assessed and replaced. At the end of each workday the tunnel was secured with plywood, caution tape, and the gate closed.